A down-the-hole drill, usually called DTH by most professionals, is basically a screwed on the bottom of a . The fast hammer action breaks hard rock into small cuttings and dust that are evacuated by a fluid (air, water or ). The DTH hammer is one of the fastest ways to drill hard rock. The system is thought to have been invented independently by Stenuic. [pdf]
Air compressor designed to take fully into account the safety of operators, but operators must ultimately be responsible for their own safety. Below the security measures only as a guidance, is aimed at the use of air compressor in the process of harm reduction. Not. .
If the air compressor within the very large space (to accommodate), in the air compressor to work outside the marked, and must cut off power and placed obvious signs. .
Work long hours in the air compressor next to the operators must wear ear protectors. .
Avoid physical and thermal fluid, heat and the exhaust pipe of contact with the surface, to avoid scalding. [pdf]
1. Prepare the rock-drilling cavern, the specifications of which can be determined according to the method of drilling. Generally speaking, the height of the cavity is 2.6-2.8 meters when drilling a horizontal hole with a down-the-hole drill. When drilling. .
When opening the hole, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get proper. .
1. When starting to work, carefully check whether the gas and water pipelines are firmly connected. Check for air leaks and water leaks. 2. Check whether the lubricator has been. [pdf]
DTH drilling rig is a percussive rotary drilling rig. Its internal structure is different from general rock drilling rigs. Its gas distribution and piston reciprocating mechanism are independent. The front end is directly connected to the drill bit and the back end is connected to the drill rod. .
1. Prepare the rock-drilling cavern, the specifications of which can be determined according to the method of drilling. Generally speaking, the height of the cavity is 2.6-2.8 meters when drilling a horizontal hole with a down-the-hole drill. When drilling. .
When opening the hole, start the motor first, and pull the push handle of the manipulator after the transfer is normal. Make it get proper. .
1. When starting to work, carefully check whether the gas and water pipelines are firmly connected. Check for air leaks and water leaks. 2. Check whether the lubricator has been. [pdf]
There are two types of de-dusting methods: one is wet de-dusting and the other is dry de-dusting. The two types of dust removal methods have different effects. .
The dry de-dusting system of the drilling rigmainly consists of filters and air ducts. In the process of drilling tool gouging, rock dust is blown out of the hole. .
Wet de-dusting is done by mixing the pressurized air with water through a mixer and pumping the water from the tank to the water pipe. The compressed air. [pdf]